SKU:W5756P484644-GIGA
The S-shaped profile of this pool lounger is engineered to follow the spine's natural curve, making it a noticeable step up from flat foam floats in both comfort and lumbar support. Designed to stay anchored in shallow water rather than drift, it suits backyard pools, resort-style setups, and anyone who wants a stable, hands-free relaxation experience outdoors. The waterproof, UV-resistant construction means it holds up through a full summer season without demanding much from you in return.
- L 44.29 x W 23.43 x H 24.41 inches
- Constructed from UV-resistant, waterproof material built to withstand prolonged sun and rain exposure with minimal maintenance
- S-curve body design follows the natural arc of the spine to deliver lumbar support and reduce fatigue during extended use
- Integrated sandbox weight compartments anchor the lounger at water depths of 8 to 12 inches — fill with sand before submerging to prevent floating
- Wide base and weighted sandbox design enhance stability and resist buoyancy in shallow pool water
- Two large drainage holes prevent water from pooling in the frame and help extend the product's usable life
- Quick-assembly construction requires only 8 screws for the external components, as the main water tank arrives pre-assembled
Features
- (1) It is made of high quality waterproof and UV resistant material, it can resist sun and rain for a long time, easy maintenance and long life, which makes it an ideal choice for outdoor furniture.
- (2) S-shaped curve fits the natural arc of the human body, provides better lumbar support and reduces fatigue brought about by prolonged lying.
- (3)The wide base and weight box design enhances stability, and sand can be added to the weight box to reduce buoyancy.
- (4) With 2 large drainage holes to prevent water from pooling and keep it dry for longer lifetime.
- (5) The concept of is quick assembly, so our water tank comes already assembled, with only the external parts needing to be assembled. Easy to assemble with only 8 screws.
- (6)The pool chair is equipped with sandboxs, it canbe ensured that it will not foat at a water depth of 20 to 30CM(8—12 in). Forproper use, first fill the sandboxs with sand, then simply immerse thepool chaise lounger in water and rotate it in all directions to removeany air bubbles, move it to the shallow area this prevents floating andensures a secure,relaxing experience.
- (7) We recommend bringing products back ashore during typhoon weather to prevent them from being blown to the bottom of the pool by strong winds.
Note: Product descriptions may reference specific features of W5756P484430-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
