SKU:W2225P174331-GIGA
The S-shaped backrest and slatted high back of this teak-toned outdoor rocker nod to classic porch furniture while delivering a geometry that actively supports the spine. Elliptical side rails allow the chair to arc smoothly between 110° and 135°, giving you a controlled, adjustable sway rather than an unpredictable lurch — a small engineering detail that adds up to noticeably better relaxation over long sits.
- Overall dimensions: 51.25 inches L x 23.5 inches W x 23.5 inches H
- Supports up to 264 lbs thanks to a solid wood frame constructed from environmentally-friendly timber
- S-shaped ergonomic profile contours to the natural curve of the back for sustained sitting comfort
- Adjustable rocking range of 110° to 135° via elliptical side rail design for a smooth, controlled motion
- Slatted seat and high back promote airflow and heat dissipation, keeping the surface cooler during warm-weather use
- Wide seat paired with integrated armrests and a tall backrest for full upper-body support while rocking
- Warm natural wood tones suit backyard, garden, patio, or balcony settings equally well
- Assembly required prior to use
Features
- Ergonomic Rocker Chair: The rocking chairs for outside has an S-shaped design that supports your back and allows for optimal comfort. Its stylish and elegant design brings back nostalgic childhood memories.
- Gentle Rocking Design: Enjoy gentle rocking comfort with this outdoor rocking chair. Its rocking base and elliptical side design allow you to relax and sway at adjustable angles of 110°-135°. Great for spending quality time with friends and family in various areas such as the living room, garden, patio, or balcony.
- Enhanced Comfort: Experience superior comfort with a spacious seat, armrests, and a high back slatted backrest, providing optimal support while rocking. The slatted design of this outdoor rocker ensures efficient heat dissipation for added comfort.
- Wood Frame: Constructed from environmentally-friendly wood, this outdoor rocker chair is not only built to last, but also showcases a natural and visually appealing esthetic with its warm tones. It has a strong loading capacity of up to 264 lbs, thanks to the superior strength of the wood.
- Wood Rocking Chair Info: Overall Dimension: 51.25" L x 23.5" W x 23.5" H, Weight Capacity: 264lbs. Assembly required.
Note: Product descriptions may reference specific features of W2225P174331-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
