SKU:T3971P555531-GIGA
The staggered S-curve silhouette of this three-tier side table does more than save floor space — it creates visual interest in corners, beside sofas, or along narrow hallways where a standard end table would feel bulky. A rustic brown wood-effect finish gives it a warm, industrial character that works across a range of living room and bedroom aesthetics.
- Overall dimensions: W 19.7 x D 7.7 x H 22.8 inches; large compartment: W 11.3 x D 7.7 x H 10.7 inches; small compartment: W 7.4 x D 7.7 x H 10.7 inches
- Particleboard construction with a scratch-resistant melamine surface that wipes clean with a damp cloth
- Four open storage compartments plus a top surface accommodate books, mugs, plants, or small decor items
- Total weight capacity of 33 lbs. with a per-shelf limit of 11 lbs.
- Protective foot pads on the base prevent scratching on hardwood, tile, and laminate floors
- Slim 7.7-inch depth suits tight spaces including small living rooms, bedside areas, and entryways
- Functions as a side table, end table, bedside unit, or freestanding display shelf
- Assembly required; hardware and instruction manual included
Features
- With its unique S-shape and compact size, this living room side table makes the most of your space while adding an industrial, eye-catching touch to any room
- Featuring a top surface and four compartments, the end table is great for books, mugs, plants, or photo frames – everything you want at your fingertips, neat and tidy
- Made from particle board, our small table is strong for everyday use. The scratch-resistant melamine surface wipes clean easily and protective foot pads keep your floors scratch-free
- Use it as an occasional table, bedside unit, or display shelf. The wood-effect finish of this small side table adds a touch of warmth to your home while blending seamlessly with any decor
- Overall Dimension of Narrow Side Table: 19.7" W x 7.7" D x 22.8" H. Weight capacity: 33 lbs. (total), 11 lbs. (shelf). Assembly required
Additional Features
- Assembled Length(inch): 19.7
- Assembled Width(inch): 7.7
- Assembled Height(inch): 22.8
- Product weight(pound): 9.81
- Main Color: Rustic Brown
- Main Material: Particle Board
- Product Dimensions: 19.7 L x 7.7 W x 22.8 H
Note: Product descriptions may reference specific features of T3971P555531-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
