SKU:W2231P261298-GIGA
This compact curved loveseat blends modern style with apartment-friendly practicality — ideal for small living rooms, studios, or home offices that need comfortable seating without bulk. Upholstered in durable 30D chenille fabric and layered with full-compression foam over a spring system, it offers supportive seating and a soft touch. The no-assembly design and easy spot-clean maintenance make it a convenient, low-fuss choice for everyday use, and the included three pillows add extra comfort and visual appeal.
- Product Dimensions: 37.4 L x 21.3 W x 21.3 H inches. Footprint: 65" W x 39" D — compact enough for small spaces and apartments.
- Seating Capacity & Weight Limit: Loveseat sized for two; supports up to 300 lbs.
- Upholstery: Blue 30D chenille fabric with tight wood-grain weave tested to 45,000+ Martindale rubs for scratch and wear resistance.
- Comfort Construction: Full-compression 30-density foam combined with a spring system for balanced support and lasting shape retention.
- No-Assembly Design: Ships ready-to-use — simply unpack and place where needed, ideal for apartment moves and tight stairwells.
- Included Accessories: Comes with three coordinating pillows to enhance comfort and styling options.
- Care Instructions: Spot-clean with mild detergent; avoid machine washing to preserve fabric integrity and finish.
- Ideal Use: Space-saving solution for small living rooms, studio apartments, guest rooms, or office lounge areas.
Features
- Ready-to-Use Design: Ships fully assembled—unbox and position immediately after 72-hour springback period.
- Scratch-Resistant Fabric: Tight wood grain chenille passes 45,000+ Martindale rubs.
- Space-Saving Dimensions: Compact 65" W x 39" D footprint fits spaces as small as 6'x6'.
- 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
- Easy Maintenance: Spot-clean with mild detergent; avoid machine washing to preserve fabric integrity.
Additional Features
- Assembled Length(inch): 65
- Assembled Width(inch): 39.4
- Assembled Height(inch): 25.2
- Weight of product(pound): 63.63
- Color: Blue
- Material: Fabric,Foam+Spring
- Product Dimensions: 37.4 L x 21.3 W x 21.3 H
Note: Product descriptions may reference specific features of W2231P261298-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
