SKU:W2231P504437-GIGA
A gently curved silhouette and deep black chenille upholstery give this compact loveseat the presence of a full-sized sofa without demanding the floor space. Its out-of-box-ready design skips the tool box entirely, making it a natural fit for studio apartments, home offices, and snug living room corners where setup time matters as much as style.
- Dimensions: W 65 x D 39.4 x H 25.2 inches
- Chenille fabric upholstery with a velvet-soft hand feel, engineered to resist pilling and daily wear
- 30-density compressed foam seat cushioning paired with a spring support system for consistent, resilient comfort
- Non-slip dot-grip fabric on the base keeps the sofa stable on hard floors without scratching surfaces
- No-assembly required -- arrives compressed and ready to use straight from the box
- Supports up to 300 lbs, making it a dependable seating option despite its compact footprint
- Includes three 13.39 x 13.39 inch decorative pillows that coordinate with the sofa's curved profile
- Scaled for small spaces including apartments, personal rooms, home offices, and commercial settings like coffee shops
Features
- Compact, elegant, and practical design: Perfect for home corners, personal rooms, apartments, home offices, coffee shops, and more.
- Luxurious Chenille Fabric: Velvet-soft upholstery resistant to pilling and daily wear.
- 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
- Includes 3 Decorative Pillows: Standard 13.39" × 13.39" (34 × 34 cm) pillows complement the sofa's design.
- Sofa Dimensions: 65" L × 39.1" W × 25.2" H
Additional Features
- Assembled Length(inch): 65
- Assembled Width(inch): 39.4
- Assembled Height(inch): 25.2
- Product weight(pound): 63.36
- Main Color: Black
- Main Material: Fabric
- Product Dimensions: 65 L x 39.4 W x 25.2 H
Note: Product descriptions may reference specific features of W2231P504437-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
