SKU:W2231P292607-GIGA
Enjoy modern comfort in a compact footprint with this coral curved loveseat — designed for small apartments, cozy nooks, or as a stylish accent in larger rooms. Upholstered in durable tight-grain chenille, it combines supportive 30D compressed foam with a spring system for comfortable seating, while the curved silhouette and included pillows create an inviting, polished look right out of the box (no assembly required).
- Dimensions: Product dimensions: 37.4 L x 21.3 W x 21.3 H. Overall footprint: 65" W x 39" D — ideal for spaces as small as 6' x 6'.
- Weight capacity: Supports up to 300 lbs.
- Comfort system: 30-density compressed sponge with integrated spring system for balanced support and resilience.
- Upholstery: Tight wood-grain chenille fabric; scratch-resistant and tested to 45,000+ Martindale rubs for long-lasting wear.
- Maintenance: Spot-clean with mild detergent; avoid machine washing to preserve fabric integrity and finish.
- Delivered ready to use: Compressed for shipping with no assembly required; includes 3 matching pillows for added style and comfort.
- Ideal use: Compact apartments, studio spaces, reception areas, or as a secondary seating piece in living rooms.
Features
- Ready-to-Use Design: Ships fully assembled—unbox and position immediately after 72-hour springback period.
- Scratch-Resistant Fabric: Tight wood grain chenille passes 45,000+ Martindale rubs
- Space-Saving Dimensions: Compact 65" W x 39" D footprint fits spaces as small as 6'x6'.
- 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
- Easy Maintenance: Spot-clean with mild detergent; avoid machine washing to preserve fabric integrity.
Additional Features
- Assembled Length(inch): 65
- Assembled Width(inch): 39.4
- Assembled Height(inch): 25.2
- Weight of product(pound): 63.63
- Color: Coral
- Material: Fabric
- Product Dimensions: 37.4 L x 21.3 W x 21.3 H
Note: Product descriptions may reference specific features of W2231P292947-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
