Sectionals
Divani Casa Platte - Modern Grey Fabric Modular Sectional Sofa
$2,562.00
Spruce up your living room with the trendy style of Divani Casa Platte Modern Grey Fabric Modular Sectional Sofa. Flaunting a simple sleek look, it has a wood frame and is upholstered in 100% polyester fabric. Designed with move-back seat...
VGMB-1675-GRY
$2500 - $3000
Freight Items
Living Room Furniture
Sectionals
VIG Furniture
Spruce up your living room with the trendy style of Divani Casa Platte Modern Grey Fabric Modular Sectional Sofa. Flaunting a simple...
Title
*
Saunter Tufted Fabric Fabric 4-Piece Sectional Sofa
from $1,150.00
Sprawl out amidst comfort and style on the Saunter Tufted Fabric 4-Piece Sectional Sofa. With square biscuit tufting, French piping detail, and soft polyester upholstery, this sectional sofa collection brings tailored style to your living space or lounge area with...
- Azure
- Beige
- Gray
EEI-5208-AZU
$1000 - $1250
Freight Items
Living Room Furniture
Modway Furniture
Sectionals
Sprawl out amidst comfort and style on the Saunter Tufted Fabric 4-Piece Sectional Sofa. With square biscuit tufting, French piping detail, and...
Color
*
Azure
Beige
Gray
Light Gray
White
Ashton Upholstered Fabric Sectional Sofa
from $303.00
Sit back and relax amidst streamlined style and supportive comfort with the Ashton Upholstered Fabric Sectional Sofa. Perfect for the living room or lounge area, this sofa is enriched with a tailored profile, separate seat cushions, and a classic nailhead...
- Azure
- Beige
- Charcoal
EEI-4994-AZU
$250 - $350
$350 - $450
$450 - $550
$550 - $700
Living Room Furniture
Modway Furniture
Sectionals
Sit back and relax amidst streamlined style and supportive comfort with the Ashton Upholstered Fabric Sectional Sofa. Perfect for the living room...
Color
*
Azure
Beige
Charcoal
Light Gray
Teal
White
Luxe Classic L-Shape Sectional Sofa
$3,359.00
$3,165.97
The Luxe L-shape sectional sofa is subtle in details and bold in comfort. This modular sofa carries a simple design language from its subtle stitching, low profile and corner design. The soft top grain leather and ample seat cushions makes...
QN-1025-01
Living Room Furniture
Moe's Home
Sectionals
The Luxe L-shape sectional sofa is subtle in details and bold in comfort. This modular sofa carries a simple design language from...
Title
*
Callidora Dark Brown Leather-Leather Match Sofa Sectional Reverse
$2,612.00
This is one leather couch with both size and style that will not disappoint. While the dark brown sectional comfortably seats four, it can fit up to six individuals if the need arises. The design is somewhat understated, but includes...
766-sofa/lying-M9805-Reverse
$2500 - $3000
Baxton Studio
Freight Items
Living Room Furniture
Sectionals
This is one leather couch with both size and style that will not disappoint. While the dark brown sectional comfortably seats four,...
Title
*
Restore 7-Piece Sectional Sofa
from $2,364.00
Note: Due to COVID-19, pickups by UPS/FedEx and freight trailers are being limited by state mandates and causing delays in processing and shipping times.Create your custom living room and lounge area with the Restore Upholstered Fabric 7-Piece Sectional Sofa. The...
- Charcoal
- White
EEI-4120-CHA
$2000 - $2500
$2500 - $3000
Living Room Furniture
Modway Furniture
Sectionals
Note: Due to COVID-19, pickups by UPS/FedEx and freight trailers are being limited by state mandates and causing delays in processing and...
Color
*
Charcoal
White
Cozy Velvet Contemporary Cloud-Like Comfort Modular Sectional
$2,960.00
from $2,293.97
- Cream Velvet V1
- Cream Velvet
Cozy Velvet Contemporary Cloud-Like Comfort Modular Sectional
$2,960.00
from $2,293.97
Bring home this Cozy 4-piece sectional for a fresh new look. Embrace casual elegance with this Cozy velvet cloud-like comfort modular fiber-filled seating option. Handsome from all angles, this piece features soft black velvet upholstery to make it an easy...
- Cream Velvet V1
- Cream Velvet
634Cream-Sec4A-MERIDIAN
$2000 - $2500
$2500 - $3000
$3500 - $4000
$4000 - $5000
Freight Items
Living Room Furniture
Meridian Furniture
Sectionals
Bring home this Cozy 4-piece sectional for a fresh new look. Embrace casual elegance with this Cozy velvet cloud-like comfort modular fiber-filled...
Color
*
Cream Velvet V1
Cream Velvet
Size
*
Seat Width
*
Naomi Velvet Contemporary 2pc. Reversible Sectional
$2,110.00
$1,689.97
- Black Velvet
- Cream Velvet
- Grey Velvet
Naomi Velvet Contemporary 2pc. Reversible Sectional
$2,110.00
$1,689.97
Bring glamour to your living room or den with this Naomi Black Velvet Sectional. This striking set blends the modern with the traditional for a look that wows from every angle. Luscious velvet provides a neutral element to your room,...
- Black Velvet
- Cream Velvet
- Grey Velvet
636Black-Sectional-MERIDIAN
$1500 - $1750
Freight Items
Living Room Furniture
Meridian Furniture
Sectionals
Bring glamour to your living room or den with this Naomi Black Velvet Sectional. This striking set blends the modern with the...
Color
*
Black Velvet
Cream Velvet
Grey Velvet
Navy Velvet
Pink Velvet
Coco Velvet Contemporary 3pc. Sectional
$3,740.00
$2,793.97
Make room for the whole gang when you add this Coco velvet three-piece sectional to your living room, den or family room. This beautiful sectional features soft black crushed velvet upholstery covering every surface for a look that's sumptuously affluent...
- Black Velvet
- Gold Velvet
- Grey Velvet
676Black-Sectional-MERIDIAN
$2500 - $3000
Freight Items
Living Room Furniture
Meridian Furniture
Sectionals
Make room for the whole gang when you add this Coco velvet three-piece sectional to your living room, den or family room....
Color
*
Black Velvet
Gold Velvet
Grey Velvet
Navy Velvet
Pink Velvet
Red Velvet
White Velvet
Jaszira Contemporary Modular - Left Facing & Right Facing Arms
$273.00
Nothing screams luxury like this Jaszira modular upholstery group. Each piece is enveloped in a luxurious velvet upholstery and showcasing button tufting, and a nail head trim accent for a tailored touch. Foam padding offers comfortable cushioning. Design the best...
- Burgundy Velvet
57330-ACME
$250 - $350
ACME Furniture
Living Room Furniture
Sectionals
Nothing screams luxury like this Jaszira modular upholstery group. Each piece is enveloped in a luxurious velvet upholstery and showcasing button tufting,...
Color
*
Burgundy Velvet
Conjure Channel Tufted Performance Velvet 4-Piece Sectional
from $1,696.00
- Black Cognac
- Black Emerald
- Black Gray
Conjure Channel Tufted Performance Velvet 4-Piece Sectional
from $1,696.00
Modern appeal surrounds the Conjure Channel Tufted Performance Velvet Upholstered 4-Piece Sectional Sofa. Luxuriously soft, stain-resistant performance velvet upholstery covers dense foam padding and an individually wrapped spring coil system for a supportive living room sectional sofa that will become...
- Black Cognac
- Black Emerald
- Black Gray
EEI-5770-BLK-COG
$1500 - $1750
$2000 - $2500
Living Room Furniture
Modway Furniture
Sectionals
Modern appeal surrounds the Conjure Channel Tufted Performance Velvet Upholstered 4-Piece Sectional Sofa. Luxuriously soft, stain-resistant performance velvet upholstery covers dense foam...
Color
*
Black Cognac
Black Emerald
Black Gray
Black Midnight Blue
Divani Casa Delmont - Modern Grey Sectional Sofa + Recliners
$6,268.00
Dimensions: Overall: W 117.5" x D 105" x H39"Seat Height: 17.5"Seat Depth: 22.5"Leg Height:2"Depth When Reclined: 38" LAF Arm Seater: 40.5" x 40" x 39" Console Table: 12.5" x 40" x 27" Armless Seater: 29.5" x 40" x 40" Armless...
VGKNE9212-8GRY-SECT
$6000+
Freight Items
Living Room Furniture
Sectionals
VIG Furniture
Dimensions: Overall: W 117.5" x D 105" x H39"Seat Height: 17.5"Seat Depth: 22.5"Leg Height:2"Depth When Reclined: 38" LAF Arm Seater: 40.5" x...
Title
*