SKU:W2231P402439-GIGA
A curved silhouette and deep black chenille upholstery give this compact loveseat a sophisticated presence that punches well above its footprint. The boneless, backrest-upgraded construction eliminates rigid internal framing in favor of a seamlessly upholstered form that works equally well anchoring a living room corner, furnishing a home office, or outfitting a guest room.
- W 67.32 x D 40.94 x H 27.56 inches overall dimensions, sized to fit studios, narrow rooms, and apartment layouts without overwhelming the space
- Black chenille upholstery with a velvet-soft hand feel and resistance to pilling and everyday wear
- 30-density compressed foam core paired with a spring support system for structured yet comfortable seating over extended use
- Non-slip dot-grip fabric on the base keeps the sofa in place on hardwood and tile floors without adhesive pads
- Backrest-upgraded boneless construction creates a smooth, continuous upholstered profile with no exposed rigid framing
- Includes three 14.17 x 14.17 inch (36 x 36 cm) decorative throw pillows in a coordinating design
- Modular-compatible form factor suits living rooms, offices, apartments, and guest rooms as a standalone 2-seater
Features
- Optimized Compact Design: Space-saving 65" L × 39.4" W profile fits corners, narrow rooms, or studios.
- Luxurious Chenille Fabric: Velvet-soft upholstery resistant to pilling and daily wear.
- 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
- Includes 3 Decorative Pillows: Standard 14.17" × 14,17" (36 × 36 cm) pillows complement the sofa's design.
Note: Product descriptions may reference specific features of W2231P402442-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
