SKU:W2311P277205-GIGA
Upgrade your workspace with this elegant and supportive swivel chair designed for long hours of sitting. Upholstered in soft green velvet and built around ergonomic principles, it combines plush comfort with targeted lumbar support to help reduce fatigue and maintain good posture—ideal for home offices, bedrooms, or study areas.
- Dimensions: 22.44 L x 11.42 W x 20.47 H (inches)
- Plush cushioning: High-grade velvet upholstery over super memory foam that conforms to the body, relieves pressure points, and promotes circulation during extended use.
- Ergonomic support: Backrest shaped to the S-curve of the spine for precise lumbar support; armrests positioned to follow natural elbow and shoulder placement, reducing strain during keyboard and mouse use.
- Smooth swivel action: 360-degree swivel for easy movement and access around your workspace.
- Durable construction: Precision sewing and reinforced edges maintain shape and appearance even after prolonged use.
- Versatile style: Subtle green velvet finish complements a variety of interiors—perfect for modern, cozy, or minimalist décor.
Features
- Noble and elegant golden base: The base is made of high-end metal material, which has been precision processed and gold-plated, presenting a dazzling golden luster and embellishing the office environment like an artwork. Stable structure, strong load-bearing capacity, ensuring safety and reliability under long-term use, while displaying a low-key sense of luxury.
- Soft and luxurious cushion: The cushion is made of high-grade fabric, filled with super memory foam, which perfectly adapts to all parts of the body. Even if you work for a long time, you can feel continuous gentle embrace, relieve pressure points, and promote blood circulation.
- Ergonomic design: Tailored according to the S-shaped curve of the human spine, the backrest provides precise lumbar support and reduces the burden on the back caused by prolonged sitting. The armrest design takes into account the natural placement angles of the elbows and shoulders to avoid occupational diseases caused by prolonged use of keyboards and mice.
- Exquisite detail processing: High precision sewing technology ensures that the edges of the cushion are flat and seamless, with strong durability, even after years of baptism, it still maintains a good shape.
Additional Features
- Assembled Length(inch): 24.6
- Assembled Width(inch): 22.84
- Assembled Height(inch): 38
- Weight of product(pound): 21.12
- Color: Green
- Material: Velvet
- Product Dimensions: 22.44 L x 11.42 W x 20.47 H
Note: Product descriptions may reference specific features of W2311P277205-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
