SKU:W2311P323757-GIGA
This mid-back office chair blends stylish striped corduroy upholstery with ergonomic support to keep you comfortable during long work, study, or relaxation sessions. Its tailored S-curve backrest and plush memory-foam cushion provide targeted lumbar support and pressure relief, while the armrests and refined construction deliver lasting durability and a polished look—ideal for home offices, bedrooms, or study nooks in a soft light-pink finish.
- Dimensions: 24.21 L x 11.62 W x 19.49 H (product dimensions)
- Upholstery: Soft, striped corduroy fabric in light pink for a cozy, fashionable appearance
- Cushioning: High-grade fabric cover filled with premium memory foam that adapts to body contours to reduce pressure points and promote circulation
- Ergonomic support: Mid-back S-shaped design delivers precise lumbar support to minimize strain during extended sitting
- Armrest design: Angled to follow natural elbow and shoulder placement, helping reduce fatigue from keyboard and mouse use
- Craftsmanship: High-precision sewing and reinforced seams for a flat, seamless edge and long-term shape retention
- Versatile use: Suitable for office desks, study areas, gaming stations, or casual seating in living spaces
Features
- Noble and elegant golden base: The base is made of high-end metal material, which has been precision processed and gold-plated, presenting a dazzling golden luster and embellishing the office environment like an artwork. Stable structure, strong load-bearing capacity, ensuring safety and reliability under long-term use, while displaying a low-key sense of luxury.
- Soft and luxurious cushion: The cushion is made of high-grade fabric, filled with super memory foam, which perfectly adapts to all parts of the body. Even if you work for a long time, you can feel continuous gentle embrace, relieve pressure points, and promote blood circulation.
- Ergonomic design: Tailored according to the S-shaped curve of the human spine, the backrest provides precise lumbar support and reduces the burden on the back caused by prolonged sitting. The armrest design takes into account the natural placement angles of the elbows and shoulders to avoid occupational diseases caused by prolonged use of keyboards and mice.
- Exquisite detail processing: High precision sewing technology ensures that the edges of the cushion are flat and seamless, with strong durability, even after years of baptism, it still maintains a good shape.
Additional Features
- Assembled Length(inch): 25.2
- Assembled Width(inch): 24.02
- Assembled Height(inch): 41.93
- Weight of product(pound): 27.06
- Color: Light Pink
- Material: Corduroy
- Product Dimensions: 24.21 L x 11.62 W x 19.49 H
Note: Product descriptions may reference specific features of W2311P323757-GIGA. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
