End Tables
Ingmar Side Table Round Tempered Glass Antique Gold Metal Couture
$448.00
$406.00
The Ingmar round side table by Safavieh Couture brings an elegant aesthetic to any room. Meticulously crafted metal is finished with antique gold gilding, and topped with tempered glass in this curvaceous piece with tall and thin tapered legs. High...
AMH8301A
$350 - $450
End Tables
Living Room Furniture
Safavieh
Tables Collection
The Ingmar round side table by Safavieh Couture brings an elegant aesthetic to any room. Meticulously crafted metal is finished with antique...
Title
*
Hayward End Table with Glass Top Chrome Stainless Steel Couture
$386.00
$309.00
Inspired by Mies van der Rohe's classic Barcelona table, the Hayward End Table makes an elegant statement in living room, family room or home office. Crafted with the classic materials of modernism, chrome and glass, its traditional 'x-style' foundation creates...
FOX9008A
$250 - $350
End Tables
Freight Items
Living Room Furniture
Safavieh
Tables Collection
Inspired by Mies van der Rohe's classic Barcelona table, the Hayward End Table makes an elegant statement in living room, family room...
Title
*
Harry 2 Drawer Side Table
$621.00
$497.00
Dimensions: 24 x 22 x 19
Material: Mdf
- White
- Light Pink , Gold
SFV3568B
$450 - $550
End Tables
Freight Items
Living Room Furniture
Safavieh
Tables Collection
Dimensions: 24 x 22 x 19
Material: Mdf
Color
*
White
Light Pink , Gold
Hanzel Side Table Glass Gold Metal Iron Couture
$228.00
Inspired by the de rigueur furnishings in prominent pre-war Park Avenue mansions in the sky, the Hanzel side table is a transitional classic. Refined gold leaf detail and glass belie the strength of its iron bodice and shelf with forged...
AMH8312A
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
Inspired by the de rigueur furnishings in prominent pre-war Park Avenue mansions in the sky, the Hanzel side table is a transitional...
Title
*
Griffin Side Table One Drawer Washed Natural Pine Wood Water Based Paint MDF Veneer Aluminum Alloy
$157.00
Griffin Side Table One Drawer Washed Natural Pine Wood Water Based Paint MDF Veneer Aluminum Alloy
$157.00
A classic country cottage look gets a fashion makeover in the chic Griffin side table. Crafted of natural washed pine with contrasting half-moon drawer pull, this timeless piece is fitted with two shelves for reading material or knickknacks. Use this...
AMH5719B
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
A classic country cottage look gets a fashion makeover in the chic Griffin side table. Crafted of natural washed pine with contrasting...
Title
*
Gemma Agate Side Table
$90.00
An enchanting fusion of nature’s beauty and contemporary decor, this Gemma Side Table overflows with depth and charisma. Gemma’s striking black agate top is paired with a natural wood border balancing on a black metal frame, flaunting artistic negative space...
- Taupe, Cherry Mahogany
ACC5301B
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
An enchanting fusion of nature’s beauty and contemporary decor, this Gemma Side Table overflows with depth and charisma. Gemma’s striking black agate...
Color
*
Taupe, Cherry Mahogany
Galium Side Table Aluminum Round Top Silver Metal Powder Coating
$119.00
An updated iteration of the classic Saarinen table, the Galium table's hour glass base looks fresh and new in a polished aluminum finish. The sleek Galium side table will add the perfect contemporary touch to modern interiors, and can be...
FOX5500A
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
An updated iteration of the classic Saarinen table, the Galium table's hour glass base looks fresh and new in a polished aluminum...
Title
*
Fritz Round Tray Side Table in Black
$138.00
Give your decor a luxe modern touch with this Fritz Side Table. Crafted of wood in a matte black finish, this sleek, dynamic piece elevates any living room with its clever tray top, inspiring endless impromptu soirees. Frame Type: WOOD...
ACC4204A
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
Give your decor a luxe modern touch with this Fritz Side Table. Crafted of wood in a matte black finish, this sleek,...
Title
*
Carrie Side Storage Side Table
from $111.00
Ideal for coastal cottage or classic contemporary décor, this Carrie Side Table makes de cluttering a breeze. The vintage grey finish on Carrie's traditionally styled frame pairs beautifully with its two removable woven baskets, and a single drawer provides additional...
- Vintage Grey
- Distressed Black
- Distressed Cream
AMH5700A
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
Ideal for coastal cottage or classic contemporary décor, this Carrie Side Table makes de cluttering a breeze. The vintage grey finish on...
Color
*
Vintage Grey
Distressed Black
Distressed Cream
Dark Cherry
Red
Brown
White Wash
Azizi Side Table Stone Top White Black Gold Metal Electroplated MDF Iron Steel
$143.00
An exquisite jewel in any contemporary living room, this stone top side table is a modern heirloom. Its smooth white top is paired with three sleek tiers finished in matte black and chic, shimmering gold. Ideal for use in pairs...
ACC3202A
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
An exquisite jewel in any contemporary living room, this stone top side table is a modern heirloom. Its smooth white top is...
Title
*
Alfie 2 Door Side Table in Indigo / Gold Couture
$597.00
$478.00
Elevate any living room with the decadence of this stylish modern 2-door side table. Its luxurious wood veneer features an exquisite texture that’s highlighted by the depth and dimension of its indigo hue, while its legs feature a radiant gold...
SFV3567A
$450 - $550
End Tables
Freight Items
Living Room Furniture
Safavieh
Tables Collection
Elevate any living room with the decadence of this stylish modern 2-door side table. Its luxurious wood veneer features an exquisite texture...
Title
*
Adena End Table With Storage Drawer
from $112.00
Chic and sophisticated, the contemporary Adena end table is a versatile addition to the living room or bedroom. Crafted of elm wood with BLACK top sitting on black Parson-style base and legs, this piece comes with a deep drawer to...
- French Grey
- Steel Teal
- White
AMH6612A
$0 - $250
End Tables
Living Room Furniture
Safavieh
Tables Collection
Chic and sophisticated, the contemporary Adena end table is a versatile addition to the living room or bedroom. Crafted of elm wood...
Color
*
French Grey
Steel Teal
White