SKU:Araceli-Rattan/Light Honey-Console Table
Elevate your entryway or living room with the Araceli console table — a handcrafted, bohemian-inspired piece that blends sculptural design with practical function. Made in Indonesia from sustainably sourced natural rattan, its flowing S-curve base and openwork weaving create an airy, artistic focal point while a laminated rattan tabletop provides a smooth display surface for decor. The Araceli arrives fully assembled and pairs coastal charm with everyday durability for modern interiors seeking exotic personality.
- Dimensions: Overall 51.20" W x 15.70" D x 29.90" H; Tabletop thickness 1.60"
- Materials: Handwoven natural rattan surfaces, laminated rattan tabletop, plywood under-tabletop, and metal frame/internal supports for added stability
- Design: Sculptural S-curve base with openwork detailing for a light, airy silhouette that functions as an artistic focal point
- Finish & Feel: Natural rattan texture and warm tones with subtle variations in color and grain — each piece is unique
- Functionality: Narrow profile ideal for entryways, hallways or behind sofas; rectangular tabletop suited for lamps, plants and decorative objects
- Construction: Handcrafted in Indonesia with engineered wood and metal reinforcement to balance aesthetics and durability
- Ready to Use: Ships fully assembled for immediate placement
- Note: Natural rattan may display variations in color, pattern and hair-like strands typical of the material
Additional Features
- PRODUCT DIMS: 51.2W x 15.7D x 29.9H
- PRIMARY FRAME: Frame: Metal
- FINISH TYPE: Light Honey
- LEG FINISHING: Light Honey
- RECOMMENDED WEIGHT CAPACITY: 50
- ASSEMBLY REQUIRED?: No
- IS THIS A SET?: No
- INCLUDES: One (1) Console Table
- STYLE: Bohemian
- ASSEMBLY: Fully Assembled
- SHIP TIMEFRAME (BUSINESS DAY): 1-2
- WARRANTY: 30 Days Limited
Product Care
- Dust rattan surface regularly. Wipe gently with damp cloth if needed. Avoid excess moisture and prolonged direct sunlight.
Compliance
- PROP65: Yes, formaldehyde
- COMPLIANCE: TSCA Title VI ; CA PROP 65
Note: Product descriptions may reference specific features of Araceli-Rattan/Light Honey-Console Table. You will receive the exact product according to the options (color, size, material, shape, etc.) you select on this page.
We're excited to get your new items to you! Here's what you can expect:
Delivery Timeframes
- Standard Shipping (FedEx/UPS): 4-7 business days
- Freight Shipping (larger items): 8-13 business days
Tracking Your Order
Once your order is packed and shipped, we'll send you a tracking number so you can follow your item's journey to you.
Delivery Methods
- Small items: Delivered by FedEx/UPS to your home or business
- Large items: Shipped via freight truck. We'll call to schedule a convenient delivery time.
Delivery Location
Items will be delivered to your porch, garage, or first dry area. In-home delivery is available in select locations for an additional fee. Contact us for details.
Our Commitment to Quality
We partner with specialized furniture delivery services to ensure your items arrive in perfect condition. While this may take a little longer, we believe it's worth the wait for damage-free delivery.
Cancellations
No fees for cancellations before shipping. Once shipped, standard return policies apply.
Returns
- Submit a return form within two days of delivery
- No restocking fees for items under $1000 (shipping costs deducted)
- 15% restocking fee for items $1000 and over
For complete details, please refer to our full Shipping & Delivery and Returns & Cancellations policies.
